Lima Metro Line 2 Routes: Stations, Free Trips and All Today on the White Parade | Answers

Lima Metro’s long-awaited new Line 2 is ready to open. From when citizens will be able to enjoy this new service for free and for how long, some questions are being asked before the imminent inauguration. In this note, we provide details about free period for line 2 along with other information related to this topic.

When will Lima Metro’s new Line 2 free service begin?

Although the free service of Line 2 of the Lima and Callo Metro is mapped to begin in December this year, it is not yet known precisely on which specific day the service will be implemented. According to the schedule, the December 21 is estimated, however; The duration of the so-called “White March” is certain, and the thousands of Peruvians near the units directed for this service will be free.

How long will Lima Metro’s new Line 2 be free?

In the first months of operation, Trains forming Line 2 of the Lima and Gallo Metro will provide free service to users. The period, known as the “White March”, will begin in December this year and last for three months.

After this initial period, the commercial operation phase of Stage 1A is expected to begin in April 2024, at which time passengers will have to pay their respective fares, paid in cash, to use the service.

What will be the sections of the new Line 2 of the Lima Metro, which will be free

It is currently known that the following five stations will be the sections where free trips can be made on the new Line 2 of the Lima Metro:

  • Avoid station 20.
  • Station 21 Santa Anita Oval.
  • Industrial Collector Station 22.
  • Station 23 Hermilio Valdizán.
  • Station 24 Santa Anita Market.
See also  SJL: Two criminals die in a road accident amid a police chase

What you need to know about Line 2 of the Lima Metro

The Metro Line 2 De Lima is a mass transit project that is part of the metro system in the city of Lima, the capital city of Peru. The line is under construction and is expected to be an important addition to the city’s public transport network, providing an efficient and sustainable alternative to urban mobility.

The Line 2 It was designed as an underground metro line that would connect the north and south of Lima, crossing the length of the city. The project aims to improve the quality of life of Lima residents by reducing traffic congestion, reducing travel times and providing a faster and safer transportation option.

Its construction Line 2 It was launched in 2015 and is expected to be fully operational in the coming years. Once completed, the route will be around 35 kilometers long and will have 27 stations. The Line 2 route will extend from the Ate district in the east of Lima to the Callo district in the west.

One of the main advantages Line 2 There will be transport capacity. The line is expected to handle up to 660,000 passengers per day, which will significantly contribute to reducing traffic congestion in the city. Additionally, Line 2 will provide a faster and more efficient transportation option as metro trains will avoid traffic jams and frequent delays on ground routes.

Another important aspect of Line 2 Its environmental impact. Using the subway as a means of mass transportation is a more sustainable alternative compared to private vehicles. By reducing the number of cars on the streets, greenhouse gas emissions and air pollution will be reduced, thereby improving air quality in the city.

See also  How much has the pension increased for ONP pensioners in Peru? | Answers

The Line 2 It will also benefit Lima residents by improving access and connectivity. The metro line will pass through many of Lima’s densely populated districts, giving residents of those areas easy access to different parts of the city. Also, the line will connect important commercial, educational and business hubs, making daily commute easier for workers and students.

In terms of infrastructure, the Line 2 It will have modern and comfortable trains, spacious and safe stations, as well as state-of-the-art signaling and communication systems. Train stations are expected to be accessible to people with reduced mobility, with ramps and lifts to ensure inclusion of all users.

Its construction Line 2 It is a complex project that requires the coordination of various organizations and the investment of significant resources. Additionally, steps have been taken to minimize impact to residents and ensure safety during construction.

Read more

Local News